Phase 2: Check paired controls and seed variation #105

Closed
opened 2026-10-20 15:04:11 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P2-11-C
Record type: Validation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 6.1, 6.2; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 3881.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P2-11 (#102).

Goal

construct legal lineage_swap and deleted_bridge pairs.

Applicable parent requirements

  • P2-11.R1: Build seeded prefixes, temporary-object teardown and A_clone controls.
  • P2-11.R3: Test meaningful seed variation and all cut/access matching conditions.

Prerequisites

Steps

  • Add A_clone, pair matching, minimum witness and meaningful-seed checks.

Definition of Done

Every pair has identical suffix intentions and repeatable match/witness artifacts.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P2-11-C/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P2-11-C; backlog-revision: 2.2.1 --> **Plan ID:** `P2-11-C` **Record type:** Validation leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 6.1, 6.2; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 3881. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P2-11 (#102)](https://git.erikinkinen.fi/erikinkinen/AES/issues/102). ## Goal construct legal lineage_swap and deleted_bridge pairs. ## Applicable parent requirements - **P2-11.R1:** Build seeded prefixes, temporary-object teardown and A_clone controls. - **P2-11.R3:** Test meaningful seed variation and all cut/access matching conditions. ## Prerequisites - [P2-11-A (#103)](https://git.erikinkinen.fi/erikinkinen/AES/issues/103) - [P2-11-B (#104)](https://git.erikinkinen.fi/erikinkinen/AES/issues/104) ## Steps - [x] Add A_clone, pair matching, minimum witness and meaningful-seed checks. ## Definition of Done Every pair has identical suffix intentions and repeatable match/witness artifacts. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P2-11-C/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 2 milestone 2026-10-20 15:04:11 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#105
No description provided.