Phase 2: Generate small and differential trace fixtures #135
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#136 Phase 2: Compare and minimize semantic mismatches
erikinkinen/AES
#133 Phase 2: Define transition and observation functions
erikinkinen/AES
#134 Phase 2: Build the independent reference interpreter
erikinkinen/AES
Reference
erikinkinen/AES#135
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan ID:
P2-18-DRecord type: Implementation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 2.3, 6.4; parent requirements and common section-11/17.4 gates apply.
Source:
AES_PHASES_2_6_PLAN.md, issue heading at line 4246.Plan SHA-256:
8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212Protocol snapshot: Download the complete governing plan.
Tracking parent: P2-18 (#131).
Goal
Provide independently executable definitions for the research profiles.
Applicable parent requirements
Prerequisites
Steps
Definition of Done
Trace legality, coverage manifest and deterministic bytes are checked independently.
Execution and acceptance contract
Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at
artifacts/backlog/2.2.1/P2-18-D/acceptance.json.Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.
An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.