Phase 2: Extend the fixed-point checker for retirement #177

Open
opened 2026-10-20 15:04:21 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P2-27-C
Record type: Implementation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 6.6; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 4751.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P2-27 (#174).

Goal

Establish or refute F2.5–F2.7 without treating standard lemmas as new results.

Applicable parent requirements

  • P2-27.R2: Extend fixed-point enumeration with retirement and both intentionally unsafe collectors.

Prerequisites

Steps

  • Add retirement and the two unsafe collectors to finite exploration.

Definition of Done

Shortest mismatch fixtures distinguish failed summaries within the declared finite domain.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P2-27-C/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P2-27-C; backlog-revision: 2.2.1 --> **Plan ID:** `P2-27-C` **Record type:** Implementation leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 6.6; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 4751. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P2-27 (#174)](https://git.erikinkinen.fi/erikinkinen/AES/issues/174). ## Goal Establish or refute F2.5–F2.7 without treating standard lemmas as new results. ## Applicable parent requirements - **P2-27.R2:** Extend fixed-point enumeration with retirement and both intentionally unsafe collectors. ## Prerequisites - [P2-20 (#143)](https://git.erikinkinen.fi/erikinkinen/AES/issues/143) - [P2-26 (#169)](https://git.erikinkinen.fi/erikinkinen/AES/issues/169) ## Steps - [ ] Add retirement and the two unsafe collectors to finite exploration. ## Definition of Done Shortest mismatch fixtures distinguish failed summaries within the declared finite domain. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P2-27-C/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 2 milestone 2026-10-20 15:04:21 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#177
No description provided.