Phase 2: Specify the deferred recovery boundary F2.7 #178

Open
opened 2026-10-20 15:04:21 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P2-27-D
Record type: Formal leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 6.6; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 4762.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P2-27 (#174).

Goal

Establish or refute F2.5–F2.7 without treating standard lemmas as new results.

Applicable parent requirements

  • P2-27.R3: Prepare the F2.7 material witness and retained-inventory contract for the phase-5 supplement.

Prerequisites

Steps

  • Define the material witness and closed-inventory premise for phase 5.

Definition of Done

Pending recovery evidence is not an admitted lemma or phase-2 proof premise.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P2-27-D/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P2-27-D; backlog-revision: 2.2.1 --> **Plan ID:** `P2-27-D` **Record type:** Formal leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 6.6; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 4762. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P2-27 (#174)](https://git.erikinkinen.fi/erikinkinen/AES/issues/174). ## Goal Establish or refute F2.5–F2.7 without treating standard lemmas as new results. ## Applicable parent requirements - **P2-27.R3:** Prepare the F2.7 material witness and retained-inventory contract for the phase-5 supplement. ## Prerequisites - [P2-27-A (#175)](https://git.erikinkinen.fi/erikinkinen/AES/issues/175) - [P2-27-B (#176)](https://git.erikinkinen.fi/erikinkinen/AES/issues/176) ## Steps - [ ] Define the material witness and closed-inventory premise for phase 5. ## Definition of Done Pending recovery evidence is not an admitted lemma or phase-2 proof premise. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P2-27-D/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 2 milestone 2026-10-20 15:04:21 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#178
No description provided.