Phase 2: Compose ratio confidence rectangles #182

Open
opened 2026-10-20 15:04:22 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P2-28-C
Record type: Implementation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 5; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 4811.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P2-28 (#179).

Goal

Replace permissive bootstrap qualification with theorem-backed bounded-seed inference.

Applicable parent requirements

  • P2-28.R1: Implement empirical-Bernstein bounds, the split Chernoff upper bound, ratio rectangles and exact atomic alpha ledger.
  • P2-28.R2: Implement independent high-precision numeric fixtures for the bound primitives; P2-24 owns exact population enumeration, conditional-AP coverage fixtures and calibration reports.

Prerequisites

Steps

  • Combine four simultaneous mean bounds without treating episodes as independent.

Definition of Done

Denominator crossings return inconclusive and paired-ratio corner fixtures match exact arithmetic.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P2-28-C/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P2-28-C; backlog-revision: 2.2.1 --> **Plan ID:** `P2-28-C` **Record type:** Implementation leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 5; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 4811. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P2-28 (#179)](https://git.erikinkinen.fi/erikinkinen/AES/issues/179). ## Goal Replace permissive bootstrap qualification with theorem-backed bounded-seed inference. ## Applicable parent requirements - **P2-28.R1:** Implement empirical-Bernstein bounds, the split Chernoff upper bound, ratio rectangles and exact atomic alpha ledger. - **P2-28.R2:** Implement independent high-precision numeric fixtures for the bound primitives; P2-24 owns exact population enumeration, conditional-AP coverage fixtures and calibration reports. ## Prerequisites - [P2-28-B (#181)](https://git.erikinkinen.fi/erikinkinen/AES/issues/181) ## Steps - [ ] Combine four simultaneous mean bounds without treating episodes as independent. ## Definition of Done Denominator crossings return inconclusive and paired-ratio corner fixtures match exact arithmetic. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P2-28-C/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 2 milestone 2026-10-20 15:04:22 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#182
No description provided.