Phase 6: Add order and schedule controls #481
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#479 Phase 6: Implement operational and schedule controls
erikinkinen/AES
#482 Phase 6: Report within-stratum temporal scope
erikinkinen/AES
#427 Phase 5: Execute phase 5 and release evidence
erikinkinen/AES
#456 Phase 6: Implement alert episode accounting
erikinkinen/AES
#475 Phase 6: Implement matched-capacity prediction models
erikinkinen/AES
Reference
erikinkinen/AES#481
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan ID:
P6-18-BRecord type: Implementation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 10.8; parent requirements and common section-11/17.4 gates apply.
Source:
AES_PHASES_2_6_PLAN.md, issue heading at line 8603.Plan SHA-256:
8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212Protocol snapshot: Download the complete governing plan.
Tracking parent: P6-18 (#479).
Goal
Rule out trivial policy or schedule recognition.
Applicable parent requirements
Prerequisites
Steps
Definition of Done
Each control accesses exactly its declared information and cannot replace a failed primary model.
Execution and acceptance contract
Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at
artifacts/backlog/2.2.1/P6-18-B/acceptance.json.Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.
An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.