Phase 6: Expand csaIV into a complete article #563
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#584 Phase 6: Decide standalone merger and report packaging
erikinkinen/AES
#588 Phase 6: Update book framework and methodology
erikinkinen/AES
#596 Phase 6: Review csaIV and resolve its scientific comments
erikinkinen/AES
#565 Phase 6: Write csaIV formal model or method
erikinkinen/AES
#566 Phase 6: Write csaIV completed study design
erikinkinen/AES
#567 Phase 6: Write csaIV complete results
erikinkinen/AES
#564 Phase 6: Write csaIV context and semantic contract
erikinkinen/AES
#570 Phase 6: Write csaIV introduction abstract and conclusion
erikinkinen/AES
#568 Phase 6: Write csaIV interpretation and validity limits
erikinkinen/AES
#569 Phase 6: Write csaIV related-work comparison
erikinkinen/AES
#571 Phase 6: Complete csaIV appendices and artifact statement
erikinkinen/AES
#572 Phase 6: Integrate and audit the complete csaIV
erikinkinen/AES
Reference
erikinkinen/AES#563
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan ID:
P6-33Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 11.3–11.5, 11.7.
Source:
AES_PHASES_2_6_PLAN.md, issue heading at line 9573.Plan SHA-256:
8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212Protocol snapshot: Download the complete governing plan.
Goal
Write the full csaIV manuscript from the completed analysis.
Retained requirements
Child issues
Closure
This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted
not_applicablechild needs the signed route decision required by section 17.4.csaIV is a full readable evidence-grounded manuscript, with no unfilled results placeholders; report/merger status is preserved.
Execution and acceptance contract
Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at
artifacts/backlog/2.2.1/P6-33/acceptance.json.Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.
An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.