Phase 2: implement descriptive clustered estimators and percentile intervals #663
No reviewers
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erikinkinen/AES!663
Loading…
Reference in a new issue
No description provided.
Delete branch "phase2/p2-14-c-descriptive-statistics"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Task
Closes #118 (P2-14-C).
Summary
Implement declared descriptive means, pooled ratios, linear quantiles and
complete paired seed/cell contrasts. Preserve operands, cell effects and
missing reasons. Recompute each estimator in all 99,999 complete-cluster
resamples and retain undefined draws without replacement.
Ordinary 95% percentile intervals are suppressed when more than 5% of draws
are undefined: 4,999 is permitted and 5,000 is suppressed. These intervals
are descriptive; confirmatory bounds and error allocation remain separate.
Validation
Original source-bound locked Python 3.14.8/NumPy 2.5.4 and portable fixtures
pass seven analytical groups and 32 negative cases. All 99,999 nonlinear
ratios match an exact-rational reference; another 99,999 paired estimates
retain unequal dependent windows and their fixed effect. Ties, zeros and
the exact undefined-draw boundary are covered.
The original source and integration receipts remain under
artifacts/backlog/2.2.1/P2-14-C/. The integrated inventory contains 295 nativetests. This refresh includes the accepted #660 predecessor at
8ed9e598d030c8cc9b8d871e7d425e9628d70965. Implementation and earlier validationrecords are unchanged; the final metadata adds the reconciliation receipt.
All eight local hooks and the frozen specification scope passed.
Reconciliation evidence
has SHA-256
ccd054e09e3bed4503a8eb9dc45aa2c6b488ebeae6d22f3cc6cd49a9d0480734.Acceptance gate and scope
Require all ten checks on this final commit, including both formal checks, and
closed native prerequisites before updating #118's single checklist and merging.
The fixtures establish method implementation; no campaign or scientific result
is supplied here. Complete csaI includes the requested Phase 5 supplement.