CI: extend expanded sanitizer suite budget to 180 minutes #671

Merged
erikinkinen merged 1 commit from fix/670-sanitizer-suite-budget into main 2026-10-30 05:51:48 +01:00
Owner

Closes #670.

Change

The six expanded-suite sanitizer jobs reached the aggregate 90-minute deadline
after 279–373 passing tests. Increase only the sanitizer job allowance to
180 minutes. The smoke allowance stays at 90 minutes. Preserve the pinned image,
Clang 19, Debug -g -O1, assertions, sanitizers, complete test inventory, one
CTest worker, four build workers, 120-second per-test limit and stop-on-failure.
Failed-run identities and hashes remain in artifacts/ci/issue-670.

Verified local evidence

  • Signed fix: 946b4c930bfc682892903786fd06c6c97636f351.
  • Signed expanded consumer: 623f8d8727500e6bb6ea44d9f70850636887e8e4 in #667.
  • The pinned Clang 19 container passed all 496 tests without failures or skips.
    Its inventory equals the earlier 496-test consumer inventory.
  • All 132 C++ compilation commands retain -g, -O1, ASan/UBSan and frame
    pointers, with no NDEBUG. Structured workflow comparison confirms the only
    workflow change is the sanitizer overall timeout, 90 to 180 minutes.
  • Every consumer byte outside the four declared fix/documentation/evidence
    files is unchanged. The prior failed attempts remain failures.
  • Complete local validation and preserved deadline evidence.
    Archive SHA-256: 2a24aa55e60b193c315a3ebe1c39fc34717cadbf4f67f2a1b5041be6962d93e1.
    Public log copies identify any credential redaction and retain original hashes.
  • The first local attempt failed on SELinux bind-mount access before setup.
    Its log is preserved. The successful attempt changed only the local mount
    labeling option; no compiler, test, assertion or sanitizer setting changed.

Required final gate

Both this fix and the exact expanded consumer head above must pass all ten
remote contexts before this bug's checklist and merge. Require the consumer's
closed prerequisites and its own final checks before its checklist and merge.
Local success alone cannot satisfy that gate. These are CI-capacity checks,
with no scientific timing or production research claim.

Closes #670. ## Change The six expanded-suite sanitizer jobs reached the aggregate 90-minute deadline after 279–373 passing tests. Increase only the sanitizer job allowance to 180 minutes. The smoke allowance stays at 90 minutes. Preserve the pinned image, Clang 19, Debug `-g -O1`, assertions, sanitizers, complete test inventory, one CTest worker, four build workers, 120-second per-test limit and stop-on-failure. Failed-run identities and hashes remain in `artifacts/ci/issue-670`. ## Verified local evidence - Signed fix: `946b4c930bfc682892903786fd06c6c97636f351`. - Signed expanded consumer: `623f8d8727500e6bb6ea44d9f70850636887e8e4` in #667. - The pinned Clang 19 container passed all 496 tests without failures or skips. Its inventory equals the earlier 496-test consumer inventory. - All 132 C++ compilation commands retain `-g`, `-O1`, ASan/UBSan and frame pointers, with no `NDEBUG`. Structured workflow comparison confirms the only workflow change is the sanitizer overall timeout, 90 to 180 minutes. - Every consumer byte outside the four declared fix/documentation/evidence files is unchanged. The prior failed attempts remain failures. - [Complete local validation and preserved deadline evidence](https://git.erikinkinen.fi/attachments/be11a4e4-bb34-4091-b506-7f06e86db24d). Archive SHA-256: `2a24aa55e60b193c315a3ebe1c39fc34717cadbf4f67f2a1b5041be6962d93e1`. Public log copies identify any credential redaction and retain original hashes. - The first local attempt failed on SELinux bind-mount access before setup. Its log is preserved. The successful attempt changed only the local mount labeling option; no compiler, test, assertion or sanitizer setting changed. ## Required final gate Both this fix and the exact expanded consumer head above must pass all ten remote contexts before this bug's checklist and merge. Require the consumer's closed prerequisites and its own final checks before its checklist and merge. Local success alone cannot satisfy that gate. These are CI-capacity checks, with no scientific timing or production research claim. <!-- aes-ci-budget-evidence: 670-local-v1 -->
erikinkinen added this to the Phase 2 milestone 2026-10-30 04:27:57 +01:00
CI: allow bounded full expanded sanitizer suite execution
Some checks failed
markdownlint / markdown-lint (pull_request) Successful in 26s
clang-format / check-format (pull_request) Successful in 47s
formal / definitions (pull_request) Successful in 1m56s
ci / smoke (pull_request) Successful in 23m13s
ci / sanitizers (pull_request) Successful in 54m56s
markdownlint / markdown-lint (push) Successful in 13s
clang-format / check-format (push) Has been cancelled
ci / sanitizers (push) Has been cancelled
ci / smoke (push) Has been cancelled
formal / definitions (push) Has been cancelled
946b4c930b
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erikinkinen/AES!671
No description provided.