[BUG] Timed deadline adapter is missing from the Rootd surface inventory #107

Closed
opened 2026-10-12 17:22:58 +02:00 by erikinkinen · 1 comment
Owner

Summary

Integration CI stops at the Rootd surface inventory because it omits the public deadline test adapter and its success marker.

Reproduction

Use Integration e2b4ccc5 with its selected Rootd b4dd956a. From Integration, run:

ROOTD_DIR=../rootd bash tests/rootd-integration-surface-inventory.sh
python3 scripts/check-rootd-integration-surface.py --rootd ../rootd \
  --inventory lib/rootd-integration-orchestration/rootd-surface-inventory.tsv

Expected and actual behavior

Both commands should account for each audited surface and reject unclassified additions. They exit 1 and report src/timed_deadline_verifier.rs::verify_public_timed_deadlines and ERIX_ROOTD:TIMED_DEADLINES_OK as unclassified.

Both belong to move: the adapter runs only in the Integration Time workload and delegates deadline policy to the orchestration library. The marker follows completed verification and invocation retirement. The production adapter remains a no-op.

Environment and identity

Affected: Integration e2b4ccc5, with Rootd b4dd956a. The relevant Rootd source files are unchanged in 2575c92d.

Evidence and prior checks

CI run 2469 reproduces the failure. The repair adds two explicit move rows with rationale. Regression controls remove each row in turn and require refusal; the existing unknown-verifier control remains. The checker keeps its strict inventory requirement.

Tracking

Related: Integration PR 12, Rootd PR 2, Phase 6.

## Summary Integration CI stops at the Rootd surface inventory because it omits the public deadline test adapter and its success marker. ## Reproduction Use Integration `e2b4ccc5` with its selected Rootd `b4dd956a`. From Integration, run: ```sh ROOTD_DIR=../rootd bash tests/rootd-integration-surface-inventory.sh python3 scripts/check-rootd-integration-surface.py --rootd ../rootd \ --inventory lib/rootd-integration-orchestration/rootd-surface-inventory.tsv ``` ## Expected and actual behavior Both commands should account for each audited surface and reject unclassified additions. They exit 1 and report `src/timed_deadline_verifier.rs::verify_public_timed_deadlines` and `ERIX_ROOTD:TIMED_DEADLINES_OK` as unclassified. Both belong to `move`: the adapter runs only in the Integration Time workload and delegates deadline policy to the orchestration library. The marker follows completed verification and invocation retirement. The production adapter remains a no-op. ## Environment and identity Affected: [Integration e2b4ccc5](https://git.erikinkinen.fi/erix/integration/commit/e2b4ccc5076260c658b999ac766ca1e3f1b9e545), with [Rootd b4dd956a](https://git.erikinkinen.fi/erix/rootd/commit/b4dd956a6ad6c89bcbbfb9c2ab898e6ee01a166e). The relevant Rootd source files are unchanged in [2575c92d](https://git.erikinkinen.fi/erix/rootd/commit/2575c92da1baee00705a3fe44f203811a65b0600). ## Evidence and prior checks [CI run 2469](https://git.erikinkinen.fi/erix/integration/actions/runs/2469) reproduces the failure. The repair adds two explicit `move` rows with rationale. Regression controls remove each row in turn and require refusal; the existing unknown-verifier control remains. The checker keeps its strict inventory requirement. ## Tracking Related: [Integration PR 12](https://git.erikinkinen.fi/erix/integration/pulls/12), [Rootd PR 2](https://git.erikinkinen.fi/erix/rootd/pulls/2), [Phase 6](https://git.erikinkinen.fi/erix/integration/issues/65).
Author
Owner

The inventory fix records both existing Timed deadline adapter items as explicit moves. The original gate now accepts all 49 move entries and independently refuses either omitted item. No production surface or warning gate is weakened.

The [inventory fix](https://git.erikinkinen.fi/erix/integration/commit/e108f76960cd6706134296fafd8209e41f50a12c) records both existing Timed deadline adapter items as explicit moves. The original gate now accepts all 49 move entries and independently refuses either omitted item. No production surface or warning gate is weakened.
erikinkinen added this to the Alpha 1 milestone 2026-10-30 09:39:16 +01:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erix/integration#107