[BUG] Rootd marker inventory blocks VM preflight #126

Closed
opened 2026-10-15 04:24:07 +02:00 by erikinkinen · 2 comments
Owner

Summary

Integration's VM preflight rejects eleven Rootd markers missing from its reviewed surface inventory.

Reproduction

Run 2651, Integration job, attempt 1 fails at tests/rootd-integration-surface-inventory.sh on Integration ff0b5c29 with selected Rootd 9c5de279.

Expected and actual behavior

Each Rootd Integration surface must have an explicit reviewed classification. The new failure diagnostics and two FAT completion witnesses lack eleven inventory rows, so the unchanged checker exits 1 before the VM matrix starts.

Environment and identity

Push workflow on feature/posix-compat. The Rust and Markdown jobs pass at the same Integration revision. This failure concerns the source inventory, not a guest result.

Evidence and prior checks

The original job names all eleven missing markers. The local correction adds those exact rows as Integration policy/evidence and passes the existing regression check. The parser, refusal rules and all previous classifications are unchanged.

Tracking

Phase completion. The separate multi-PTY runtime failure remains in #125.

  • Audit and classify every missing marker without broadening the checker.
  • Pass the existing inventory regression check on the selected Rootd source.
  • Confirm preflight proceeds on the corrected published revision.
## Summary Integration's VM preflight rejects eleven Rootd markers missing from its reviewed surface inventory. ## Reproduction [Run 2651, Integration job, attempt 1](https://git.erikinkinen.fi/erix/integration/actions/runs/2651/jobs/1/attempt/1) fails at `tests/rootd-integration-surface-inventory.sh` on Integration `ff0b5c29` with selected Rootd `9c5de279`. ## Expected and actual behavior Each Rootd Integration surface must have an explicit reviewed classification. The new failure diagnostics and two FAT completion witnesses lack eleven inventory rows, so the unchanged checker exits 1 before the VM matrix starts. ## Environment and identity Push workflow on `feature/posix-compat`. The Rust and Markdown jobs pass at the same Integration revision. This failure concerns the source inventory, not a guest result. ## Evidence and prior checks The original job names all eleven missing markers. The local correction adds those exact rows as Integration policy/evidence and passes the existing regression check. The parser, refusal rules and all previous classifications are unchanged. ## Tracking [Phase completion](https://git.erikinkinen.fi/erix/integration/issues/65). The separate multi-PTY runtime failure remains in [#125](https://git.erikinkinen.fi/erix/integration/issues/125). - [x] Audit and classify every missing marker without broadening the checker. - [x] Pass the existing inventory regression check on the selected Rootd source. - [x] Confirm preflight proceeds on the corrected published revision.
Author
Owner

f227c0ae adds the eleven reviewed entries. The existing inventory regression check passes against Rootd 9c5de279; the checker and previous classifications are unchanged. The new automatic CI run will confirm that preflight proceeds.

[f227c0ae](https://git.erikinkinen.fi/erix/integration/commit/f227c0aefee6a75497a6a0c7c36fafbf319659a9) adds the eleven reviewed entries. The existing inventory regression check passes against Rootd `9c5de279`; the checker and previous classifications are unchanged. The new automatic CI run will confirm that preflight proceeds.
Author
Owner

The corrected preflight passes in run 2654 at f227c0ae: all 60 inventory entries and the existing regression checks pass. Closing the inventory regression. The VM matrix and the initial-shell failure in #125 remain open.

The corrected preflight passes in [run 2654](https://git.erikinkinen.fi/erix/integration/actions/runs/2654/jobs/1/attempt/1) at `f227c0ae`: all 60 inventory entries and the existing regression checks pass. Closing the inventory regression. The VM matrix and the initial-shell failure in #125 remain open.
erikinkinen added this to the Alpha 1 milestone 2026-10-30 09:34:16 +01:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erix/integration#126
No description provided.