generated from erix/meta
[BUG] Launch startup control reserves an obsolete two-column client window #4
Labels
No labels
alpha-1
bug
ci
docs
duplicate
enhancement
help wanted
invalid
performance
phase-6
question
refactor
security
wontfix
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erix/lib-bootstrap#4
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Summary
Launch startup control reserves an obsolete two-column client window. Maintained validation cannot reach its intended successful boundary.
Reproduction
Run cargo test --all-targets --all-features and select source_columns_are_checked_with_the_complete_native_window. The original failing source and current repairs are distinct; failures and true exit statuses are retained.
Expected and actual behavior
The maintained source should compile, discover its original controls and complete the specified checks without warnings. The independent fixture expects 25 occupied slots and a 26-slot valid window. Current startup framing requires three columns per client: 27 occupied slots and a separate intake slot, so the original positive fixture is correctly refused.
Environment and identity
Evidence and prior checks
Specify the complete 27-slot occupied geometry and 28-slot window in the existing control. Preserve all overflow and refusal cases. The exact frozen repair passes 88 units, formatting, strict host and freestanding Clippy, warning-denied builds and rustdoc. Signed fix: 7a630dc8.
Tests and exact-head CI now run in parallel with implementation. A skipped, pending or unrun check is not a pass; independent source work continues while regressions are repaired.