[BUG] Thematic test module paths fail maintained Rust formatting and test discovery #30

Closed
opened 2026-10-12 12:11:47 +02:00 by erikinkinen · 1 comment
Owner

Summary

Thematic test module paths fail maintained Rust formatting and test discovery. Maintained validation cannot reach its intended successful boundary.

Reproduction

Run cargo fmt --all -- --check and compile the maintained unit test targets at the linked original component revision. exact_invocation and acquisition test modules must resolve their existing concurrent and thematic child sources. The original failing source and current repairs are distinct; failures and true exit statuses are retained.

Expected and actual behavior

The maintained source should compile, discover its original controls and complete the specified checks without warnings. Rust tooling searches the implicit nested module location rather than the existing thematic source. Formatting or test discovery fails before the original controls can run. This is a module-routing defect, not a missing source file or a reason to delete coverage.

Environment and identity

  • Component repository/revision and Integration source graph: original vfsd source, original Integration graph.
  • Image profile, digest and build/runtime configuration: maintained host validation and selected component workflow; no guest image is claimed by this report.
  • Hardware or VM, architecture, firmware and toolchain versions: x86_64 host with the workflow-selected toolchain; no hardware or firmware-specific cause is inferred.
  • Input/session route and granted authority relevant to reproduction: explicit source graph and local validation inputs; no additional runtime authority is introduced.
  • Last known working revision, if known: not established.

Evidence and prior checks

Declare the exact existing module paths and preserve every original test. Thirteen path corrections cover the affected components. Current-source formatting checks pass for all four; compiled unit and target checks follow the coordinated shared IPC dependency repair.

Tests and exact-head CI now run in parallel with implementation. A skipped, pending or unrun check is not a pass; independent source work continues while regressions are repaired.

Tracking

Phase completion tracks the full remaining goal. Signed source fixes, coherent dependency adoption and exact validation results will be recorded before closure.

## Summary Thematic test module paths fail maintained Rust formatting and test discovery. Maintained validation cannot reach its intended successful boundary. ## Reproduction Run cargo fmt --all -- --check and compile the maintained unit test targets at the linked original component revision. exact_invocation and acquisition test modules must resolve their existing concurrent and thematic child sources. The original failing source and current repairs are distinct; failures and true exit statuses are retained. ## Expected and actual behavior The maintained source should compile, discover its original controls and complete the specified checks without warnings. Rust tooling searches the implicit nested module location rather than the existing thematic source. Formatting or test discovery fails before the original controls can run. This is a module-routing defect, not a missing source file or a reason to delete coverage. ## Environment and identity - Component repository/revision and Integration source graph: [original vfsd source](https://git.erikinkinen.fi/erix/vfsd/commit/6c55e006eae4af0dbec726c9c2ce859c4895c9a3), [original Integration graph](https://git.erikinkinen.fi/erix/integration/commit/a615de2f69c25d4575d0c349757a0017082f988b). - Image profile, digest and build/runtime configuration: maintained host validation and selected component workflow; no guest image is claimed by this report. - Hardware or VM, architecture, firmware and toolchain versions: x86_64 host with the workflow-selected toolchain; no hardware or firmware-specific cause is inferred. - Input/session route and granted authority relevant to reproduction: explicit source graph and local validation inputs; no additional runtime authority is introduced. - Last known working revision, if known: not established. ## Evidence and prior checks Declare the exact existing module paths and preserve every original test. Thirteen path corrections cover the affected components. Current-source formatting checks pass for all four; compiled unit and target checks follow the coordinated shared IPC dependency repair. Tests and exact-head CI now run in parallel with implementation. A skipped, pending or unrun check is not a pass; independent source work continues while regressions are repaired. ## Tracking [Phase completion](https://git.erikinkinen.fi/erix/integration/issues/65) tracks the full remaining goal. Signed source fixes, coherent dependency adoption and exact validation results will be recorded before closure.
Author
Owner

Resolved on 066362ac: CI390 completes formatting and test discovery and passes all 546 unit controls. The original module-routing criterion is met.

Resolved on [066362ac](https://git.erikinkinen.fi/erix/vfsd/commit/066362ac3339432414379b0fc7a1b662d661a035): [CI390](https://git.erikinkinen.fi/erix/vfsd/actions/runs/390) completes formatting and test discovery and passes all 546 unit controls. The original module-routing criterion is met.
erikinkinen added this to the Alpha 1 milestone 2026-10-30 09:35:19 +01:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erix/vfsd#30
No description provided.