Phase 2: Execute phase 2 and release evidence #194

Open
opened 2026-10-20 15:04:23 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P2-31
Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 6, 11.1, 17.1, 17.2.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 4953.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.

Goal

finish phase 2 with an auditable conclusion.

Retained requirements

  • P2-31.R1: Freeze hashes and execute 12600 diagnostic and 1536 compaction runs plus all formal/reference/kernel validation manifests.
  • P2-31.R2: Regenerate V2 diagnostics, F2 proof/checker results, kernel correspondence and the csaI contribution decision from raw artifacts.
  • P2-31.R3: Publish the phase-2-protocol-2.2 archive and update docs/phase2.md and csaI result inputs.

Child issues

Closure

This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted not_applicable child needs the signed route decision required by section 17.4.

phase-2 implementation and evidence checks pass and every witness or
explicit null result is preserved. The phase-5 F2.7 supplement remains declared
pending; it is neither an admitted lemma nor a premise of phase-2 proofs.
Milestone 3 does not require journal_ready or a positive effect.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P2-31/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.

<!-- aes-plan-id: P2-31; backlog-revision: 2.2.1 --> **Plan ID:** `P2-31` **Record type:** Tracking parent; no implementation PR **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 6, 11.1, 17.1, 17.2. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 4953. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). ## Goal finish phase 2 with an auditable conclusion. ## Retained requirements - **P2-31.R1:** Freeze hashes and execute 12600 diagnostic and 1536 compaction runs plus all formal/reference/kernel validation manifests. - **P2-31.R2:** Regenerate V2 diagnostics, F2 proof/checker results, kernel correspondence and the csaI contribution decision from raw artifacts. - **P2-31.R3:** Publish the phase-2-protocol-2.2 archive and update docs/phase2.md and csaI result inputs. ## Child issues - [ ] [P2-31-A (#195)](https://git.erikinkinen.fi/erikinkinen/AES/issues/195) — Verify phase-2 readiness and freeze the execution manifest - [ ] [P2-31-B (#196)](https://git.erikinkinen.fi/erikinkinen/AES/issues/196) — Execute the fixed phase-2 AES matrices - [ ] [P2-31-C (#197)](https://git.erikinkinen.fi/erikinkinen/AES/issues/197) — Verify phase-2 reference and external evidence - [ ] [P2-31-D (#198)](https://git.erikinkinen.fi/erikinkinen/AES/issues/198) — Produce phase-2 tables figures and conclusions - [ ] [P2-31-E (#199)](https://git.erikinkinen.fi/erikinkinen/AES/issues/199) — Review and archive the phase-2 evidence release ## Closure This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted `not_applicable` child needs the signed route decision required by section 17.4. phase-2 implementation and evidence checks pass and every witness or explicit null result is preserved. The phase-5 F2.7 supplement remains declared pending; it is neither an admitted lemma nor a premise of phase-2 proofs. Milestone 3 does not require journal_ready or a positive effect. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P2-31/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process. Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.
erikinkinen added this to the Phase 2 milestone 2026-10-20 15:04:23 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Blocks
Depends on
Reference
erikinkinen/AES#194
No description provided.