Phase 3: Exhaustively check priced brackets and the fixed example #257

Open
opened 2026-10-20 15:04:32 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P3-25-G
Record type: Validation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 7.5, 7.6; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 5764.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P3-25 (#250).

Goal

Replace the degenerate sole lower bound with the explicitly budget-priced relaxation.

Applicable parent requirements

  • P3-25.R3: Independently check all small-instance reachable beliefs, zero/full budgets and the exact 32-leaf quarter-risk fixture; any false bound blocks execution.

Prerequisites

Steps

  • Check reachable small beliefs/budgets and the 32-leaf quarter-risk fixture.

Definition of Done

Every bracket contains the exact optimum; the fixed example gives L0=0 and L=U=1/4.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P3-25-G/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P3-25-G; backlog-revision: 2.2.1 --> **Plan ID:** `P3-25-G` **Record type:** Validation leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 7.5, 7.6; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 5764. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P3-25 (#250)](https://git.erikinkinen.fi/erikinkinen/AES/issues/250). ## Goal Replace the degenerate sole lower bound with the explicitly budget-priced relaxation. ## Applicable parent requirements - **P3-25.R3:** Independently check all small-instance reachable beliefs, zero/full budgets and the exact 32-leaf quarter-risk fixture; any false bound blocks execution. ## Prerequisites - [P2-31 (#194)](https://git.erikinkinen.fi/erikinkinen/AES/issues/194) - [P3-25-E (#255)](https://git.erikinkinen.fi/erikinkinen/AES/issues/255) - [P3-25-F (#256)](https://git.erikinkinen.fi/erikinkinen/AES/issues/256) ## Steps - [ ] Check reachable small beliefs/budgets and the 32-leaf quarter-risk fixture. ## Definition of Done Every bracket contains the exact optimum; the fixed example gives L0=0 and L=U=1/4. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P3-25-G/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 3 milestone 2026-10-20 15:04:32 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#257
No description provided.