Phase 3: Execute phase 3 and release evidence #262

Open
opened 2026-10-20 15:04:33 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P3-27
Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 7, 11.1, 17.1, 17.2.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 5824.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.

Goal

close the epistemic phase with all planned observations.

Retained requirements

  • P3-27.R1: Execute pilot/freeze stages and all 12600 diagnostic, 180*N3 primary, 3840 latency-sensitivity and 17280 scaling runs.
  • P3-27.R2: Rebuild C3a/C3b, F3 certificates, diagnostic V3 tables and all decision-frontier evidence.
  • P3-27.R3: Release phase-3-protocol-2.2 and update docs/phase3.md.

Child issues

Closure

This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted not_applicable child needs the signed route decision required by section 17.4.

observation restoration is demonstrated or its failed control is
resolved before release; milestone 4 closes on valid evidence.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P3-27/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.

<!-- aes-plan-id: P3-27; backlog-revision: 2.2.1 --> **Plan ID:** `P3-27` **Record type:** Tracking parent; no implementation PR **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 7, 11.1, 17.1, 17.2. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 5824. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). ## Goal close the epistemic phase with all planned observations. ## Retained requirements - **P3-27.R1:** Execute pilot/freeze stages and all 12600 diagnostic, 180*N3 primary, 3840 latency-sensitivity and 17280 scaling runs. - **P3-27.R2:** Rebuild C3a/C3b, F3 certificates, diagnostic V3 tables and all decision-frontier evidence. - **P3-27.R3:** Release phase-3-protocol-2.2 and update docs/phase3.md. ## Child issues - [ ] [P3-27-A (#263)](https://git.erikinkinen.fi/erikinkinen/AES/issues/263) — Verify phase-3 readiness and pilot capacity - [ ] [P3-27-B (#264)](https://git.erikinkinen.fi/erikinkinen/AES/issues/264) — Execute the phase-3 pilot - [ ] [P3-27-C (#265)](https://git.erikinkinen.fi/erikinkinen/AES/issues/265) — Select N3 and freeze the phase-3 production design - [ ] [P3-27-D (#266)](https://git.erikinkinen.fi/erikinkinen/AES/issues/266) — Execute the phase-3 production matrices - [ ] [P3-27-E (#267)](https://git.erikinkinen.fi/erikinkinen/AES/issues/267) — Produce phase-3 inference and comparison outputs - [ ] [P3-27-F (#268)](https://git.erikinkinen.fi/erikinkinen/AES/issues/268) — Review and archive the phase-3 evidence release ## Closure This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted `not_applicable` child needs the signed route decision required by section 17.4. observation restoration is demonstrated or its failed control is resolved before release; milestone 4 closes on valid evidence. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P3-27/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process. Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.
erikinkinen added this to the Phase 3 milestone 2026-10-20 15:04:33 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Blocks
Depends on
Reference
erikinkinen/AES#262
No description provided.