Phase 4: Freeze representation guidance and scope #313

Open
opened 2026-10-20 15:04:41 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P4-22
Record type: Review leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 2.6, 8.4, 8.5; common contracts in sections 3–5, 11 and 17.4.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 6485.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.

Goal

Prepare an independently measured contribution or its documented limitation.

Prerequisites

Steps

  • Complete the rule-versus-prior-work dossier and explicit one-host/serialized scope.
  • Implement source-specific reporting for AES, native library and kernel correspondence.
  • Implement checks requiring the native post-calibration lock before evaluation and the precision lock before AES production; P4-24-C and P4-24-G perform the actual freezes.

Definition of Done

Unsupported kernel/hardware rankings and uncorrected superiority claims cannot enter the manuscript.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P4-22/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P4-22; backlog-revision: 2.2.1 --> **Plan ID:** `P4-22` **Record type:** Review leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 2.6, 8.4, 8.5; common contracts in sections 3–5, 11 and 17.4. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 6485. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). ## Goal Prepare an independently measured contribution or its documented limitation. ## Prerequisites - [P3-27 (#262)](https://git.erikinkinen.fi/erikinkinen/AES/issues/262) - [P4-17 (#294)](https://git.erikinkinen.fi/erikinkinen/AES/issues/294) - [P4-18 (#295)](https://git.erikinkinen.fi/erikinkinen/AES/issues/295) - [P4-23 (#314)](https://git.erikinkinen.fi/erikinkinen/AES/issues/314) ## Steps - [ ] Complete the rule-versus-prior-work dossier and explicit one-host/serialized scope. - [ ] Implement source-specific reporting for AES, native library and kernel correspondence. - [ ] Implement checks requiring the native post-calibration lock before evaluation and the precision lock before AES production; P4-24-C and P4-24-G perform the actual freezes. ## Definition of Done Unsupported kernel/hardware rankings and uncorrected superiority claims cannot enter the manuscript. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P4-22/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 4 milestone 2026-10-20 15:04:41 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#313
No description provided.