Phase 5: Replay and hash material recovery state #349
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#347 Phase 5: Add version 6 logs and replay
erikinkinen/AES
#319 Phase 4: Execute phase 4 and release evidence
erikinkinen/AES
#348 Phase 5: Encode version-6 material transitions
erikinkinen/AES
Reference
erikinkinen/AES#349
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan ID:
P5-10-BRecord type: Implementation leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 4.1, 9.1, 9.2; parent requirements and common section-11/17.4 gates apply.
Source:
AES_PHASES_2_6_PLAN.md, issue heading at line 6948.Plan SHA-256:
8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212Protocol snapshot: Download the complete governing plan.
Tracking parent: P5-10 (#347).
Goal
reconstruct the entire material experiment from history.
Applicable parent requirements
Prerequisites
Steps
Definition of Done
Tamper fixtures fail and full/resumed execution has identical complete canonical state.
Execution and acceptance contract
Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at
artifacts/backlog/2.2.1/P5-10-B/acceptance.json.Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.
An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.