Phase 4: Execute phase 4 and release evidence #319

Open
opened 2026-10-20 15:04:42 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P4-24
Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 8, 11.1, 17.1, 17.2.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 6559.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.

Goal

deliver all historical experiments and close the phase.

Retained requirements

  • P4-24.R1: Execute pilot/freeze stages, all 90,000 diagnostic and 480*N4 primary runs, and 2340 calibration (900 primitive plus 1440 rule) and 12960 native evaluation processes.
  • P4-24.R2: Rebuild C4a/C4b, F4 bounds, lifecycle frontiers, V4 diagnostics and kernel correspondence.
  • P4-24.R3: Release phase-4-protocol-2.2 and update docs/phase4.md.

Child issues

Closure

This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted not_applicable child needs the signed route decision required by section 17.4.

milestone 5 closes with complete controls and supported, opposite
or inconclusive conditional conclusions.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P4-24/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.

<!-- aes-plan-id: P4-24; backlog-revision: 2.2.1 --> **Plan ID:** `P4-24` **Record type:** Tracking parent; no implementation PR **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 8, 11.1, 17.1, 17.2. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 6559. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). ## Goal deliver all historical experiments and close the phase. ## Retained requirements - **P4-24.R1:** Execute pilot/freeze stages, all 90,000 diagnostic and 480*N4 primary runs, and 2340 calibration (900 primitive plus 1440 rule) and 12960 native evaluation processes. - **P4-24.R2:** Rebuild C4a/C4b, F4 bounds, lifecycle frontiers, V4 diagnostics and kernel correspondence. - **P4-24.R3:** Release phase-4-protocol-2.2 and update docs/phase4.md. ## Child issues - [ ] [P4-24-A (#320)](https://git.erikinkinen.fi/erikinkinen/AES/issues/320) — Verify phase-4 readiness and pilot capacity - [ ] [P4-24-B (#321)](https://git.erikinkinen.fi/erikinkinen/AES/issues/321) — Execute the phase-4 pilot - [ ] [P4-24-C (#322)](https://git.erikinkinen.fi/erikinkinen/AES/issues/322) — Select N4 and freeze the phase-4 AES design - [ ] [P4-24-D (#323)](https://git.erikinkinen.fi/erikinkinen/AES/issues/323) — Execute the phase-4 AES production matrices - [ ] [P4-24-E (#324)](https://git.erikinkinen.fi/erikinkinen/AES/issues/324) — Execute native primitive calibration - [ ] [P4-24-F (#325)](https://git.erikinkinen.fi/erikinkinen/AES/issues/325) — Execute native selector-rule calibration - [ ] [P4-24-G (#326)](https://git.erikinkinen.fi/erikinkinen/AES/issues/326) — Freeze native coefficients and selection rules - [ ] [P4-24-H (#327)](https://git.erikinkinen.fi/erikinkinen/AES/issues/327) — Execute native evaluation - [ ] [P4-24-I (#328)](https://git.erikinkinen.fi/erikinkinen/AES/issues/328) — Produce phase-4 inference and design-rule evidence - [ ] [P4-24-J (#329)](https://git.erikinkinen.fi/erikinkinen/AES/issues/329) — Review and archive the phase-4 evidence release ## Closure This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted `not_applicable` child needs the signed route decision required by section 17.4. milestone 5 closes with complete controls and supported, opposite or inconclusive conditional conclusions. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P4-24/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process. Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.
erikinkinen added this to the Phase 4 milestone 2026-10-20 15:04:42 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Blocks
Depends on
Reference
erikinkinen/AES#319
No description provided.