Phase 5: Execute the phase-5 AES production matrices #431

Open
opened 2026-10-20 15:05:00 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P5-32-D
Record type: Execution leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 9, 10.10, 11.1, 17.1, 17.2; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 7955.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P5-32 (#427).

Goal

complete the material phase and integrated article evidence.

Applicable parent requirements

  • P5-32.R1: Execute pilot/freeze stages, all original phase-5 campaigns, 3072 additional AES/service reclamation pairs and 768 application conformance pairs; rebuild C5a and diagnostics.

Prerequisites

Steps

  • Run 31200 fixed, 192*N5 primary, 6144 lifetime, 3072 original conformance, 3072 reclamation and 768 application-conformance AES executions, replaying the actual application tapes captured by P5-32-H.

Definition of Done

IDs/counts reconcile once, including the supplementary 400+200+200 subset; all semantic invariants are checked.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P5-32-D/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P5-32-D; backlog-revision: 2.2.1 --> **Plan ID:** `P5-32-D` **Record type:** Execution leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 9, 10.10, 11.1, 17.1, 17.2; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 7955. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P5-32 (#427)](https://git.erikinkinen.fi/erikinkinen/AES/issues/427). ## Goal complete the material phase and integrated article evidence. ## Applicable parent requirements - **P5-32.R1:** Execute pilot/freeze stages, all original phase-5 campaigns, 3072 additional AES/service reclamation pairs and 768 application conformance pairs; rebuild C5a and diagnostics. ## Prerequisites - [P4-24 (#319)](https://git.erikinkinen.fi/erikinkinen/AES/issues/319) - [P5-32-H (#435)](https://git.erikinkinen.fi/erikinkinen/AES/issues/435) ## Steps - [ ] Run 31200 fixed, 192*N5 primary, 6144 lifetime, 3072 original conformance, 3072 reclamation and 768 application-conformance AES executions, replaying the actual application tapes captured by P5-32-H. ## Definition of Done IDs/counts reconcile once, including the supplementary 400+200+200 subset; all semantic invariants are checked. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P5-32-D/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 5 milestone 2026-10-20 15:05:00 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#431
No description provided.