Phase 6: Execute phase 6 and freeze the analysed evidence #513
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
Depends on
#532 Phase 6: Freeze the five concrete article writing plans
erikinkinen/AES
#514 Phase 6: Verify phase-6 readiness and pilot capacity
erikinkinen/AES
#515 Phase 6: Execute phase-6 AES and service pilots
erikinkinen/AES
#519 Phase 6: Evaluate the sealed internal tests
erikinkinen/AES
#521 Phase 6: Run prototype production tests
erikinkinen/AES
#522 Phase 6: Run application production tests
erikinkinen/AES
#520 Phase 6: Run independent-generator production tests
erikinkinen/AES
#516 Phase 6: Select M and freeze phase-6 production sampling
erikinkinen/AES
#517 Phase 6: Generate and seal the internal production corpus
erikinkinen/AES
#525 Phase 6: Freeze the cumulative research evidence
erikinkinen/AES
#524 Phase 6: Compute diagnostic and timing evidence
erikinkinen/AES
Reference
erikinkinen/AES#513
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Plan ID:
P6-28Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 10, 11.1, 17.1, 17.2.
Source:
AES_PHASES_2_6_PLAN.md, issue heading at line 8996.Plan SHA-256:
8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212Protocol snapshot: Download the complete governing plan.
Goal
Complete production analysis before expanding any draft into a full article.
Retained requirements
Child issues
Closure
This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted
not_applicablechild needs the signed route decision required by section 17.4.All eight primary decisions are explicit and evidence_complete is assessed; manuscript work and milestone-7 closure remain pending.
Execution and acceptance contract
Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at
artifacts/backlog/2.2.1/P6-28/acceptance.json.Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.
An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.