Phase 6: Execute phase 6 and freeze the analysed evidence #513

Open
opened 2026-10-20 15:05:14 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P6-28
Record type: Tracking parent; no implementation PR
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 10, 11.1, 17.1, 17.2.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 8996.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.

Goal

Complete production analysis before expanding any draft into a full article.

Retained requirements

  • P6-28.R1: Execute all pilot/precision/qualification stages; generate 192*(1600+M) internal traces, freeze fits, then execute 64M external AES, 16M prototype and 24*M application traces.
  • P6-28.R2: Rebuild C6a–C6c with every C6b component, all diagnostics, timing/validity reports and cross-article claim tables; validate all five evidence packages.
  • P6-28.R3: Release the versioned phase-6 evidence, update docs/phase6.md and freeze evidence_lock.json including all earlier-phase supplements and unavailable-result reasons.

Child issues

Closure

This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted not_applicable child needs the signed route decision required by section 17.4.

All eight primary decisions are explicit and evidence_complete is assessed; manuscript work and milestone-7 closure remain pending.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P6-28/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.

<!-- aes-plan-id: P6-28; backlog-revision: 2.2.1 --> **Plan ID:** `P6-28` **Record type:** Tracking parent; no implementation PR **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 10, 11.1, 17.1, 17.2. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 8996. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). ## Goal Complete production analysis before expanding any draft into a full article. ## Retained requirements - **P6-28.R1:** Execute all pilot/precision/qualification stages; generate 192*(1600+M) internal traces, freeze fits, then execute 64*M external AES, 16*M prototype and 24*M application traces. - **P6-28.R2:** Rebuild C6a–C6c with every C6b component, all diagnostics, timing/validity reports and cross-article claim tables; validate all five evidence packages. - **P6-28.R3:** Release the versioned phase-6 evidence, update docs/phase6.md and freeze evidence_lock.json including all earlier-phase supplements and unavailable-result reasons. ## Child issues - [ ] [P6-28-A (#514)](https://git.erikinkinen.fi/erikinkinen/AES/issues/514) — Verify phase-6 readiness and pilot capacity - [ ] [P6-28-B (#515)](https://git.erikinkinen.fi/erikinkinen/AES/issues/515) — Execute phase-6 AES and service pilots - [ ] [P6-28-C (#516)](https://git.erikinkinen.fi/erikinkinen/AES/issues/516) — Select M and freeze phase-6 production sampling - [ ] [P6-28-D (#517)](https://git.erikinkinen.fi/erikinkinen/AES/issues/517) — Generate and seal the internal production corpus - [ ] [P6-28-E (#518)](https://git.erikinkinen.fi/erikinkinen/AES/issues/518) — Fit and freeze all predictive models and thresholds - [ ] [P6-28-F (#519)](https://git.erikinkinen.fi/erikinkinen/AES/issues/519) — Evaluate the sealed internal tests - [ ] [P6-28-G (#520)](https://git.erikinkinen.fi/erikinkinen/AES/issues/520) — Run independent-generator production tests - [ ] [P6-28-H (#521)](https://git.erikinkinen.fi/erikinkinen/AES/issues/521) — Run prototype production tests - [ ] [P6-28-I (#522)](https://git.erikinkinen.fi/erikinkinen/AES/issues/522) — Run application production tests - [ ] [P6-28-J (#523)](https://git.erikinkinen.fi/erikinkinen/AES/issues/523) — Compute primary discrimination and operational inference - [ ] [P6-28-K (#524)](https://git.erikinkinen.fi/erikinkinen/AES/issues/524) — Compute diagnostic and timing evidence - [ ] [P6-28-L (#525)](https://git.erikinkinen.fi/erikinkinen/AES/issues/525) — Freeze the cumulative research evidence ## Closure This is an AND tracking parent, not an implementation task. Close it only after every child is accepted and the original parent acceptance below is verified. A permitted `not_applicable` child needs the signed route decision required by section 17.4. All eight primary decisions are explicit and evidence_complete is assessed; manuscript work and milestone-7 closure remain pending. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P6-28/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process. Native blocking dependencies below represent the child-closure requirements; the parent must never block its own children.
erikinkinen added this to the Phase 6 milestone 2026-10-20 15:05:14 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#513
No description provided.