Phase 6: Compute primary discrimination and operational inference #523

Open
opened 2026-10-20 15:05:16 +02:00 by erikinkinen · 0 comments
Owner

Plan ID: P6-28-J
Record type: Analysis leaf
Scientific protocol: 2.2 · Backlog revision: 2.2.1
Specification: sections 10, 11.1, 17.1, 17.2; parent requirements and common section-11/17.4 gates apply.
Source: AES_PHASES_2_6_PLAN.md, issue heading at line 9113.
Plan SHA-256: 8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212
Protocol snapshot: Download the complete governing plan.
Tracking parent: P6-28 (#513).

Goal

Complete production analysis before expanding any draft into a full article.

Applicable parent requirements

  • P6-28.R2: Rebuild C6a–C6c with every C6b component, all diagnostics, timing/validity reports and cross-article claim tables; validate all five evidence packages.

Prerequisites

Steps

  • Compute C6a, C6c and all six source components of C6b from frozen predictions and per-seed bounded primitives. Apply the declared conditional-AP eligibility, source averaging, margins and error allocations to both C6a and C6c.

Definition of Done

C6a and C6c each have a reproducible confirmatory decision, and all twelve C6b component intervals are present. Eight-family allocations, fixed source weights, AP/ratio bounds, failure classifications and permitted claims reproduce; the cumulative decision inventory contains all eight primary contrasts.

Execution and acceptance contract

Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at

artifacts/backlog/2.2.1/P6-28-J/acceptance.json.

Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change.

An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.

<!-- aes-plan-id: P6-28-J; backlog-revision: 2.2.1 --> **Plan ID:** `P6-28-J` **Record type:** Analysis leaf **Scientific protocol:** 2.2 · **Backlog revision:** 2.2.1 **Specification:** sections 10, 11.1, 17.1, 17.2; parent requirements and common section-11/17.4 gates apply. **Source:** `AES_PHASES_2_6_PLAN.md`, issue heading at line 9113. **Plan SHA-256:** `8acdaeb52d6a94fcad7de64d64521cd465f608344d63560b45f9202f5af71212` **Protocol snapshot:** [Download the complete governing plan](https://git.erikinkinen.fi/attachments/31cb768b-4788-4e38-aba9-9d7f0d1ee16d). **Tracking parent:** [P6-28 (#513)](https://git.erikinkinen.fi/erikinkinen/AES/issues/513). ## Goal Complete production analysis before expanding any draft into a full article. ## Applicable parent requirements - **P6-28.R2:** Rebuild C6a–C6c with every C6b component, all diagnostics, timing/validity reports and cross-article claim tables; validate all five evidence packages. ## Prerequisites - [P5-32 (#427)](https://git.erikinkinen.fi/erikinkinen/AES/issues/427) - [P6-28-F (#519)](https://git.erikinkinen.fi/erikinkinen/AES/issues/519) - [P6-28-G (#520)](https://git.erikinkinen.fi/erikinkinen/AES/issues/520) - [P6-28-H (#521)](https://git.erikinkinen.fi/erikinkinen/AES/issues/521) - [P6-28-I (#522)](https://git.erikinkinen.fi/erikinkinen/AES/issues/522) ## Steps - [ ] Compute C6a, C6c and all six source components of C6b from frozen predictions and per-seed bounded primitives. Apply the declared conditional-AP eligibility, source averaging, margins and error allocations to both C6a and C6c. ## Definition of Done C6a and C6c each have a reproducible confirmatory decision, and all twelve C6b component intervals are present. Eight-family allocations, fixed source weights, AP/ratio bounds, failure classifications and permitted claims reproduce; the cumulative decision inventory contains all eight primary contrasts. ## Execution and acceptance contract Apply the governing semantic/data/statistical contracts in sections 3–5 and the relevant phase section, plus the section-11 checks applicable to this task. Section 17.4 defines the required acceptance evidence. Store the outcome and immutable prerequisite/input/output hashes at `artifacts/backlog/2.2.1/P6-28-J/acceptance.json`. Only explicit dependency and parent-closure edges govern readiness; numbering adds no predecessor dependency. Checkboxes are work/acceptance items, not commit quotas. Keep implementation changes independently reviewable using the existing PR template. Execution, review and gate tasks close with their evidence/decision records and a PR only when tracked artifacts change. An unsupported scientific effect is a valid result. Missing correctness validation, invalid inference or absent required review is not completion. Do not change endpoints, matrices, margins, inference rules or sample sizes outside the protocol change-control process.
erikinkinen added this to the Phase 6 milestone 2026-10-20 15:05:16 +02:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Reference
erikinkinen/AES#523
No description provided.