Preserve delegation topology in moved-holder oracle fixtures #642
No reviewers
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erikinkinen/AES!642
Loading…
Reference in a new issue
No description provided.
Delete branch "phase2/bug-641-moved-oracle-fixture-indexes"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Task
Closes #641.
Summary
The moved-holder oracle fixture rebuilt core edge records without delegation indexes. That silently weakened the eager-resolver scenarios even though actual-use conformance still passed. Use the now-merged production mover and assert preservation of incoming/delegation indexes, validity markers and every capability field except the holder.
Scope
Correct the regression test and its documentation only. Add hand-derived structural/usable residue and effective-access sets for all seven withdrawal mechanisms. Preserve existing role-binding, empty-destination, policy-cohort and oracle-isolation checks. Production code is unchanged.
Design intent
A fixture must preserve the state it claims to preserve. Independent expected mechanism outcomes ensure oracle/UseCap agreement cannot hide a damaged resolver topology.
Phase discipline
This fixture defect was found during #98 snapshot-restoration review. It has its own issue, branch and PR. P2-08-B component work remains on its separate branch; there are no campaign or protocol changes.
Verification
At baseline
6f395749f9dae392173d04153f43c71a824b90ce, the preserved assertion patch makes the test fail withmovement fixture erased delegation indexes. The corrected test passes. All 65 CTests pass at signed source9f4cbd40fbd142f34a5a57d45644ef940b263f54in Debug, Release and Clang ASan/UBSan, including original legacy fixtures and actual operation replay. All eight repository hooks pass.Reproduction patch, before/after logs, full JUnit and toolchains. All eight final-head Forgejo checks must pass before the three checklist items are checked once and the PR merges.