CI: sanitizer workflow deadline truncates the expanded passing suite #649
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Blocks
#100 Phase 2: Implement immutable intent tapes
erikinkinen/AES
Reference
erikinkinen/AES#649
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Reproduction
PR #648 at signed head
885bb62f8037be033b57b9eebae173656b51e416expanded the complete suite to 91 tests. Both sanitizer jobs hit the existing
15-minute workflow deadline on 2026-10-20, after passing tests 1–80 and while
running test 81 (
aes_phase1_figures_tests). No test assertion failed.at 22:28:14 UTC with
context deadline exceeded.and Clang ASan/UBSan. Remote smoke jobs also completed successfully.
The cold build, dependency setup and full instrumented suite share one deadline.
The expanded suite now exhausts it under the normal concurrent push/PR jobs.
This is a CI capacity regression; successful partial output is not a passing gate.
Fix
Use a bounded 30-minute sanitizer job budget, preserving the 120-second per-test
timeout, stop-on-failure, full unfiltered suite, sanitizer settings, compiler pin,
and all eight required checks. Document the reason and preserve both failure logs.
No modeled semantics, data protocol, source tests or assertion thresholds change.
Steps
Definition of done
The independently signed fix PR passes its full CI suite. P2-09 remains blocked
until this fix is merged, integrated and its own final-head checks pass; its
checklist must not be completed on the timed-out head.