CI: budget cold sanitizer jobs for the complete suite #650
No reviewers
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erikinkinen/AES!650
Loading…
Reference in a new issue
No description provided.
Delete branch "phase2/bug-649-sanitizer-job-budget"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Task
Closes #649.
Summary
The expanded 91-test suite passed locally, but both PR #648 sanitizer jobs
exhausted the 15-minute job deadline after 80 passing tests. Give cold setup,
compilation, the complete suite and cleanup a bounded 30-minute budget.
Scope
Only the sanitizer workflow's overall timeout and its explanatory documentation
change. The full unfiltered suite, compiler/container pin, sanitizer settings,
120-second per-test timeout, stop-on-failure and required checks are preserved.
Design intent
Keep the per-test hang guard separate from the capacity budget for a growing
suite. The preserved push/PR logs show the same deadline and test boundary,
after both independent compressed-artifact reference checks passed. Successful
partial output remains a failed check; no failure is suppressed or retried
unchanged until it happens to pass.
Phase discipline
This is a CI regression discovered during P2-09, filed separately from its
implementation. #100 is natively blocked by #649. Research semantics and the
scientific protocol are unchanged. Job timing is infrastructure evidence only.
Verification
f47ad2925b72e4a5355636e1f6c02301cd7fe8a7changes exactly the workflow and documentation.jobs.sanitizers.timeout-minutes,from 15 to 30. All eight local hooks and
git diff --checkpass.d8b505405a3c4f637facc2168a13072c3f2db1577fffd56fa02b9d9dde40e36f. The archive also identifies the complete 91-test local evidencefrom PR #648; no additional simulator rerun is claimed for this config change.
steps are checked once and it is merged. P2-09 must then pass its own final-head
CI with this fix integrated before its checklist is updated or it is merged.