Phase 2: Accept the instrumentation parent with verified child evidence #627

Merged
erikinkinen merged 2 commits from phase2/p2-06-instrumentation-acceptance into main 2026-10-20 18:35:13 +02:00
Owner

Task

Closes #89 (P2-06 tracking parent).

Summary

All three instrumentation children are accepted and merged. This closure maps
R1-R3 and the original parent acceptance to their immutable evidence. A scoped
checker verifies the child source identities, archives, logs, toolchains and
complete JUnit suites and rejects a corrupted archive.

Scope

Includes the parent acceptance record, child-verification inventory, evidence
checker and closure documentation. It adds no mechanism or scientific campaign.
The owner requires one branch and PR per issue, including tracking parents.

Design intent

Reuse the accepted child evidence and preserve its exact identity. The checker
verifies all nine archived configurations: 50, 51 and 52 tests per child, or
459 recorded test executions. These are not new runs or independent samples.
Live child issue closure, merged PRs and signed final heads are recorded.
Eight successful pre-merge CI contexts per child are distinguished from any
post-merge push rerun still pending at the verification time.

Phase discipline

Full observation belongs to Phase 2. Restricted views, carriers and recovery
retain their own gates. No scholarly review or campaign acceptance is claimed.

Verification

The evidence checker passes on source commit
e79b521ed5. Appending corruption to a child ZIP
makes it fail with exit 1 before trusting archive contents. All repository
hooks pass. Child PRs #624, #625 and #626 are merged and issues #90-#92 closed.

Parent source/archive and live-closure evidence.
Acceptance records: artifacts/backlog/2.2.1/P2-06/.
The parent's three checklist entries will be checked once after all eight
final-head Forgejo checks pass, immediately before merge.

## Task Closes #89 (P2-06 tracking parent). ## Summary All three instrumentation children are accepted and merged. This closure maps R1-R3 and the original parent acceptance to their immutable evidence. A scoped checker verifies the child source identities, archives, logs, toolchains and complete JUnit suites and rejects a corrupted archive. ## Scope Includes the parent acceptance record, child-verification inventory, evidence checker and closure documentation. It adds no mechanism or scientific campaign. The owner requires one branch and PR per issue, including tracking parents. ## Design intent Reuse the accepted child evidence and preserve its exact identity. The checker verifies all nine archived configurations: 50, 51 and 52 tests per child, or 459 recorded test executions. These are not new runs or independent samples. Live child issue closure, merged PRs and signed final heads are recorded. Eight successful pre-merge CI contexts per child are distinguished from any post-merge push rerun still pending at the verification time. ## Phase discipline Full observation belongs to Phase 2. Restricted views, carriers and recovery retain their own gates. No scholarly review or campaign acceptance is claimed. ## Verification The evidence checker passes on source commit e79b521ed5efdccd90a6de8cf60cf96b990b7ef1. Appending corruption to a child ZIP makes it fail with exit 1 before trusting archive contents. All repository hooks pass. Child PRs #624, #625 and #626 are merged and issues #90-#92 closed. [Parent source/archive and live-closure evidence](https://git.erikinkinen.fi/attachments/bfbd15d2-30c7-49d2-980f-d7fceb1069b2). Acceptance records: `artifacts/backlog/2.2.1/P2-06/`. The parent's three checklist entries will be checked once after all eight final-head Forgejo checks pass, immediately before merge.
erikinkinen added this to the Phase 2 milestone 2026-10-20 18:27:01 +02:00
Record verified P2-06 child closure and parent acceptance
All checks were successful
markdownlint / markdown-lint (pull_request) Successful in 28s
clang-format / check-format (pull_request) Successful in 30s
ci / smoke (pull_request) Successful in 3m55s
ci / sanitizers (pull_request) Successful in 3m59s
markdownlint / markdown-lint (push) Successful in 14s
clang-format / check-format (push) Successful in 19s
ci / smoke (push) Successful in 2m35s
ci / sanitizers (push) Successful in 2m39s
dba8123909
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erikinkinen/AES!627
No description provided.