CI: retain assertions with optimized Debug smoke compilation #662

Merged
erikinkinen merged 1 commit from phase2/bug-661-optimized-debug-smoke into main 2026-10-21 06:40:06 +02:00
Owner

Task

Closes #661.

Summary

The complete 292-test consumer hit the 90-minute smoke deadline after 190/189
passing tests. Configure GCC Debug smoke with explicit -g -O1, retaining
assertions, debug information, all tests and all current failure settings.

Scope and design intent

Only the smoke configure flag and its documentation change. Compiler, image,
one CTest worker, complete inventory, both job deadlines and the sanitizer job
are unchanged. This records a tested optimized Debug profile; it does not claim
identical diagnostics to unoptimized compilation or scientific timing evidence.

Verification

  • Signed source b58a4bf4227fa3cc621df62a5e9781e68e7795df; structural comparison proves every other workflow
    field unchanged. All eight local hooks and frozen eleven-PDF scope checks pass.
  • Consumer source d01ec511de58981c91f18b1b0425e4fa8687f76b passes all 292 tests without skips in local
    GCC Debug -g -O1, with one worker (225.02 seconds).
    Its complete inventory matches the earlier integrated suite. Every one of
    124 C++ compilation commands retains -g, selects -O1 and omits NDEBUG.
  • Every consumer source byte except the two declared fix files is unchanged.
  • Complete failed logs and local validation, SHA-256 77f25e389dea0edaf4291b1d635c2f03dcd56be252eb831fe4fc73e526ad5257.
  • Require all eight final-head remote contexts on both this fix and consumer
    #657 before this bug's three checklist items and merge. Then require #104's
    closed prerequisites and its own final checks before its single checklist
    item and merge. The 192-test fix branch alone cannot establish consumer capacity.
# Task Closes #661. ## Summary The complete 292-test consumer hit the 90-minute smoke deadline after 190/189 passing tests. Configure GCC Debug smoke with explicit `-g -O1`, retaining assertions, debug information, all tests and all current failure settings. ## Scope and design intent Only the smoke configure flag and its documentation change. Compiler, image, one CTest worker, complete inventory, both job deadlines and the sanitizer job are unchanged. This records a tested optimized Debug profile; it does not claim identical diagnostics to unoptimized compilation or scientific timing evidence. ## Verification - Signed source `b58a4bf4227fa3cc621df62a5e9781e68e7795df`; structural comparison proves every other workflow field unchanged. All eight local hooks and frozen eleven-PDF scope checks pass. - Consumer source `d01ec511de58981c91f18b1b0425e4fa8687f76b` passes all 292 tests without skips in local GCC Debug `-g -O1`, with one worker (225.02 seconds). Its complete inventory matches the earlier integrated suite. Every one of 124 C++ compilation commands retains `-g`, selects `-O1` and omits `NDEBUG`. - Every consumer source byte except the two declared fix files is unchanged. - [Complete failed logs and local validation](https://git.erikinkinen.fi/attachments/9299fdf0-c4f0-4015-9b59-db69b34291c1), SHA-256 `77f25e389dea0edaf4291b1d635c2f03dcd56be252eb831fe4fc73e526ad5257`. - Require all eight final-head remote contexts on both this fix and consumer #657 before this bug's three checklist items and merge. Then require #104's closed prerequisites and its own final checks before its single checklist item and merge. The 192-test fix branch alone cannot establish consumer capacity.
erikinkinen added this to the Phase 2 milestone 2026-10-21 05:59:10 +02:00
CI: use assertion-enabled optimized Debug for the complete smoke suite (#661)
Some checks failed
markdownlint / markdown-lint (pull_request) Successful in 19s
clang-format / check-format (pull_request) Successful in 35s
ci / smoke (pull_request) Successful in 15m8s
ci / sanitizers (pull_request) Successful in 28m45s
ci / smoke (push) Has been cancelled
markdownlint / markdown-lint (push) Has been cancelled
ci / sanitizers (push) Has been cancelled
clang-format / check-format (push) Has been cancelled
b58a4bf422
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erikinkinen/AES!662
No description provided.