CI: retain assertions with optimized Debug smoke compilation #662
No reviewers
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erikinkinen/AES!662
Loading…
Reference in a new issue
No description provided.
Delete branch "phase2/bug-661-optimized-debug-smoke"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Task
Closes #661.
Summary
The complete 292-test consumer hit the 90-minute smoke deadline after 190/189
passing tests. Configure GCC Debug smoke with explicit
-g -O1, retainingassertions, debug information, all tests and all current failure settings.
Scope and design intent
Only the smoke configure flag and its documentation change. Compiler, image,
one CTest worker, complete inventory, both job deadlines and the sanitizer job
are unchanged. This records a tested optimized Debug profile; it does not claim
identical diagnostics to unoptimized compilation or scientific timing evidence.
Verification
b58a4bf4227fa3cc621df62a5e9781e68e7795df; structural comparison proves every other workflowfield unchanged. All eight local hooks and frozen eleven-PDF scope checks pass.
d01ec511de58981c91f18b1b0425e4fa8687f76bpasses all 292 tests without skips in localGCC Debug
-g -O1, with one worker (225.02 seconds).Its complete inventory matches the earlier integrated suite. Every one of
124 C++ compilation commands retains
-g, selects-O1and omitsNDEBUG.77f25e389dea0edaf4291b1d635c2f03dcd56be252eb831fe4fc73e526ad5257.#657 before this bug's three checklist items and merge. Then require #104's
closed prerequisites and its own final checks before its single checklist
item and merge. The 192-test fix branch alone cannot establish consumer capacity.