WIP: Skip duplicate same-repository pull request jobs #2

Closed
erikinkinen wants to merge 8 commits from feature/posix-compat into main
Owner

Summary and rationale

Skip duplicate pull-request CI jobs when the source and destination repositories are equal. Push CI already covers same-repository branches; fork pull requests still need their own runs. Apply the guard to every job before any steps execute.

Tracking and scope

The linked component audit, implementation and consumer requirements remain part of this WIP review. The phase-wide guest and toolchain build requirements stay with the phase completion issue.

Architecture, authority and failure behavior

No runtime change: the workflow reads event metadata and skips redundant jobs. It adds no capability, credential, permission, dependency or unsafe code. Fork pull requests, pushes and manual runs retain their existing eligibility. A skipped job is not test-pass evidence.

Validation evidence

Formatting, strict Clippy, warning-denied builds and documentation, unit tests, and applicable native/VM and consumer regressions remain required for the declared scope. Authored controls and older successful runs do not establish current full acceptance.

Review checklist

  • Original change preserves dependency selections and runtime authority.
  • Signed commit uses a tagged title and an explanatory body.
  • Inline comments explain the guard; code files remain below 1,000 lines.
  • Shared template and testing manual document the same CI rule.
  • Shared governance and issue/PR template files remain unchanged.
  • Related issues and phase metadata track the implemented workflow scope.
  • No secrets, private reports or unsupported validation claims are published.

This review remains WIP until its declared scope and dependent requirements are complete.

## Summary and rationale Skip duplicate pull-request CI jobs when the source and destination repositories are equal. Push CI already covers same-repository branches; fork pull requests still need their own runs. Apply the guard to every job before any steps execute. ## Tracking and scope - [meta #2](https://git.erikinkinen.fi/erix/meta/issues/2) - [lib-deflate #1](https://git.erikinkinen.fi/erix/lib-deflate/issues/1) - [integration #65](https://git.erikinkinen.fi/erix/integration/issues/65) The linked component audit, implementation and consumer requirements remain part of this WIP review. The phase-wide guest and toolchain build requirements stay with the phase completion issue. ## Architecture, authority and failure behavior No runtime change: the workflow reads event metadata and skips redundant jobs. It adds no capability, credential, permission, dependency or unsafe code. Fork pull requests, pushes and manual runs retain their existing eligibility. A skipped job is not test-pass evidence. ## Validation evidence Formatting, strict Clippy, warning-denied builds and documentation, unit tests, and applicable native/VM and consumer regressions remain required for the declared scope. Authored controls and older successful runs do not establish current full acceptance. ## Review checklist - [x] Original change preserves dependency selections and runtime authority. - [x] Signed commit uses a tagged title and an explanatory body. - [x] Inline comments explain the guard; code files remain below 1,000 lines. - [x] Shared template and testing manual document the same CI rule. - [x] Shared governance and issue/PR template files remain unchanged. - [x] Related issues and phase metadata track the implemented workflow scope. - [x] No secrets, private reports or unsupported validation claims are published. This review remains WIP until its declared scope and dependent requirements are complete.
ci: Skip duplicate same-repository pull request jobs
All checks were successful
CI / markdown (push) Successful in 12s
CI / test (push) Successful in 29s
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
971cede306
Skip pull-request jobs when the head and base repository names match,
since push CI already covers these branches. Retain fork pull-request,
push and manual execution and existing release publication conditions.
Apply the guard before any job steps, including Markdown validation.

Test execution and CI observation are deferred at the user's request;
no execution result is claimed for this workflow-only change.
ci: Adopt the signed original Git dependency helper
All checks were successful
CI / markdown (pull_request) Has been skipped
CI / test (pull_request) Has been skipped
CI / markdown (push) Successful in 4s
CI / test (push) Successful in 18s
03488f8152
Select the verified immutable Integration helper that preserves actual
Git objects and denies registry dependencies without obsolete path
patches. Retain every duplicate same-repository PR guard. Where needed,
adopt the coherent signed ABI graph and preserve original authority and
validation budgets. Maintain canonical documentation formatting.

Tests and exact-head CI run in parallel with implementation. Earlier failed,
skipped or unrun checks remain distinct from actual passes. Keep the full
EriX guest build generations and external Rust/LLVM guest rebuild required;
no final all-repository CI success or guest completion is claimed.
ci: Adopt the signed original Git dependency helper
All checks were successful
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Successful in 5s
CI / test (push) Successful in 21s
c60a370852
Select the verified immutable Integration helper that preserves actual
Git objects and denies registry dependencies without obsolete path
patches. Retain every duplicate same-repository PR guard. Where needed,
adopt the coherent signed ABI graph and preserve original authority and
validation budgets. Maintain canonical documentation formatting.

Tests and exact-head CI run in parallel with implementation. Earlier failed,
skipped or unrun checks remain distinct from actual passes. Keep the full
EriX guest build generations and external Rust/LLVM guest rebuild required;
no final all-repository CI success or guest completion is claimed.
ci: Select the reviewed native process custody helper
Some checks failed
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Successful in 5s
CI / test (push) Failing after 11s
a1681e5605
Select the coherent Integration source for dependency preparation and
native process ownership. This keeps helper inputs aligned with the
published runtime producer and refuses unsupported descriptor queries
before starting a child.
ci: Adopt the repaired native signal owner
All checks were successful
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Successful in 10s
CI / test (push) Successful in 36s
9250209649
Select the coherent Integration helper that admits observed default or
ignored reserved signals while preserving complete native action identity.
Keep the existing workflow commands and limits for Integration #118.
ci: Carry checked Cargo inputs through component jobs
Some checks are pending
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / test (push) Has started running
CI / markdown (push) Has started running
77b6bdea77
Prepare Cargo inputs with the selected Integration helper and carry its
workspace, environment and target directory through the existing CI steps.
Keep shared dependency and review policies aligned.

Refs: erix/integration#142
ci: Select the repaired Cargo gateway
Some checks are pending
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / test (push) Successful in 1m31s
CI / markdown (push) Has started running
ccc339a43c
Use the shared gateway that selects installed Rust tools when a component
has no toolchain file. Keep tool selection, feature-branch resolution and
original source checks together in the pinned helper snapshot.

Refs: erix/integration#147
ci: Use the shared acquisition fix for packed Git transfers
All checks were successful
CI / test (push) Successful in 36s
CI / markdown (push) Successful in 10s
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
171c9c43da
Use the shared acquisition fix for packed Git transfers. The pinned helper
keeps unexpected object-store metadata outside the acquired source context.

Refs: erix/integration#150
erikinkinen added this to the Alpha 1 milestone 2026-10-30 09:34:41 +01:00
Author
Owner

This source is now split into feature PRs, starting at #4 and ending at #4. Each PR links its prerequisite. The complete stack preserves the runtime changes and dependency declarations; obsolete pin checkpoints and documented source-acquisition differences are separated from feature behavior.

Closing this aggregate without merging. The replacement PRs remain WIP for their remaining integration and review.

This source is now split into feature PRs, starting at #4 and ending at #4. Each PR links its prerequisite. The complete stack preserves the runtime changes and dependency declarations; obsolete pin checkpoints and documented source-acquisition differences are separated from feature behavior. Closing this aggregate without merging. The replacement PRs remain WIP for their remaining integration and review.
erikinkinen closed this pull request 2026-10-30 18:17:24 +01:00
All checks were successful
CI / test (push) Successful in 36s
CI / markdown (push) Successful in 10s
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped

Pull request closed

Sign in to join this conversation.
No description provided.