WIP: Provision original staged client factories through owned IPC #36

Draft
erikinkinen wants to merge 3 commits from feature/owned-staged-client-factories into feature/exact-width-materialized-relocations
Owner

Provision original staged client factories through owned IPC.

Depends on #35 (feature/exact-width-materialized-relocations).

  • Separate this feature from the preceding changes.
  • Link matching provider PRs and complete integrated acceptance.

Cross-repository API dependencies are still being mapped to their feature PRs.

Provision original staged client factories through owned IPC. Depends on #35 (`feature/exact-width-materialized-relocations`). - [x] Separate this feature from the preceding changes. - [ ] Link matching provider PRs and complete integrated acceptance. Cross-repository API dependencies are still being mapped to their feature PRs.
erikinkinen added this to the Alpha 1 milestone 2026-10-30 12:02:35 +01:00
feat: Provision original staged client factories through owned IPC
Some checks failed
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Failing after 5s
CI / test (push) Failing after 44s
7c51503df1
Provision original staged client factories through owned IPC.
ci: Use shared development dependency profiles
Some checks failed
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / test (push) Has been cancelled
CI / markdown (push) Has been cancelled
a473452e28
Keep authored manifests on main and select coordinated providers through Integration. Resolve branches once per run, retain the frozen snapshot and helper identity as artifacts, and use shared source checks instead of copied tests and guides.
ci: Declare policy helper and output boundaries
Some checks failed
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Failing after 42s
CI / test (push) Failing after 2m18s
6967a14e7e
Select a disjoint operation parent for policy evidence and explicitly identify the helper checkout excluded from original component input. Keep the complete dependency policy and existing acceptance commands.
Some checks failed
CI / test (pull_request) Has been skipped
CI / markdown (pull_request) Has been skipped
CI / markdown (push) Failing after 42s
CI / test (push) Failing after 2m18s
This pull request is marked as a work in progress.
This branch is out-of-date with the base branch
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin 'feature/owned-staged-client-factories:feature/owned-staged-client-factories'
git switch 'feature/owned-staged-client-factories'

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch 'feature/exact-width-materialized-relocations'
git merge --no-ff 'feature/owned-staged-client-factories'
git switch 'feature/owned-staged-client-factories'
git rebase 'feature/exact-width-materialized-relocations'
git switch 'feature/exact-width-materialized-relocations'
git merge --ff-only 'feature/owned-staged-client-factories'
git switch 'feature/owned-staged-client-factories'
git rebase 'feature/exact-width-materialized-relocations'
git switch 'feature/exact-width-materialized-relocations'
git merge --no-ff 'feature/owned-staged-client-factories'
git switch 'feature/exact-width-materialized-relocations'
git merge --squash 'feature/owned-staged-client-factories'
git switch 'feature/exact-width-materialized-relocations'
git merge --ff-only 'feature/owned-staged-client-factories'
git switch 'feature/exact-width-materialized-relocations'
git merge 'feature/owned-staged-client-factories'
git push origin 'feature/exact-width-materialized-relocations'
Sign in to join this conversation.
No description provided.