WIP: Align signed runtime dependencies #2
No reviewers
Labels
No labels
bug
ci
docs
duplicate
enhancement
help wanted
invalid
performance
phase-6
question
refactor
security
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erix/timed!2
Loading…
Reference in a new issue
No description provided.
Delete branch "feature/posix-compat"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Summary and rationale
Align the existing immutable dependency selections for coordinated runtime adoption. This review changes Cargo selections and the applicable roadmap; the repository's Rust implementation files are unchanged.
Tracking and scope
Tracks #1 and erix/integration#1. This review remains WIP until the complete runtime graph and product-image validation are accepted.
Architecture, authority and failure behavior
Preserve original signed Git objects and full commit selectors. This update adds no dependency, API declaration, capability grant or runtime fallback. Actual product VM validation remains necessary for the complete adopted graph.
Validation evidence
Original coherent realm source CI acceptance — 18 September 2026: Signed
ca80cc28eea9fd44bb7cb87b11da5288bc53f829passes CI 55 and CI 54. All four terminal logs are complete (60,241 bytes), with zero final warnings. This closes the original CI observation recorded above. Coherent catalog publication, actual consumer VMs and full guest-build acceptance remain separate open requirements.Coherent realm image service prerequisites — 18 September 2026: Signed
ca80cc28eea9fd44bb7cb87b11da5288bc53f829selects the original shared wire/startup dependency graph. Direct Rust implementation bytes are unchanged. All 8 default, all-feature and separate production development/release configurations pass 21 unit tests per configuration, strict host/native Clippy and freestanding linking with fatal linker warnings. Formatting, private-item rustdoc and Markdown pass, with zero warnings. Original push/PR CI is under observation. Matching catalog adoption and real consumer VMs remain requirements; complete realm and full in-guest build acceptance remain open.Signed
1081a766d65c4cd9d1aaa0d0a16ad43625763df7aligns the existing dependency selections with the original signed runtime graph. This checkpoint changes Cargo selections and the roadmap; this repository's Rust implementation files are unchanged. Formatting, strict Clippy, private rustdoc and canonical documentation checks pass without warnings. Default/all-feature development/release tests pass 21 default / 21 all-feature tests. Independent production configurations also pass strict host/native Clippy and native builds:timed-runtime: 21 development / 21 release tests,timed-runtime-time: 21 development / 21 release tests. There are 8 supported native builds in total. Push/review CI 52/53 passes with complete classified logs and no final warnings. The product catalog, product VM acceptance and guest build remain pending.Review checklist
Coherent dependency checkpoint — 20 September 2026: signed/pushed commit df6b4cafe00d0f2a6349c13d3d62581222eb15cf aligns original shared dependency pins with the explicit installer-rights contract. Only the manifest and roadmap change; local implementation, APIs and authority policy are unchanged. Four strict 21-unit configurations, four native builds with the maintained linker layout, host/native Clippy, formatting, private rustdoc and dependency checks pass without warnings. Original CI 56/57 passes with four complete hashed logs (60,236 bytes), zero warning candidates.
Full catalog equality and actual consumer-image validation remain required under Integration regression 68. The broader work remains tracked by phase completion, including native external Rust/LLVM/runtime rebuilding and both complete EriX-in-EriX generations. This dependency checkpoint does not close full lifecycle, frame or self-hosting acceptance.
Acknowledged terminal service dependencies — 21 September 2026: signed 7f30072bca6f7c5ae089367f5b6d848b43fa6d70 selects the original shared libraries for repeated terminal observation, exact acknowledgement and final CPU measurements under Kernel design 20. All 4 strict 21-test selected development/release feature configurations, warning-denied host/native builds with the maintained linker layout, host/native Clippy, private rustdoc, applicable doctests, formatting and dependency/Markdown checks pass. All authored code remains below 1,000 lines. Original CI 58, 59 passes; complete hashed logs total 60,280 bytes with zero warning candidates. Full service CPU/profiler VM acceptance and guest builds remain open in Phase 6 completion.
View command line instructions
Checkout
From your project repository, check out a new branch and test the changes.Merge
Merge the changes and update on Forgejo.Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.