CI: budget cold sanitizer jobs for the complete suite #650

Merged
erikinkinen merged 1 commit from phase2/bug-649-sanitizer-job-budget into main 2026-10-21 00:46:09 +02:00
Owner

Task

Closes #649.

Summary

The expanded 91-test suite passed locally, but both PR #648 sanitizer jobs
exhausted the 15-minute job deadline after 80 passing tests. Give cold setup,
compilation, the complete suite and cleanup a bounded 30-minute budget.

Scope

Only the sanitizer workflow's overall timeout and its explanatory documentation
change. The full unfiltered suite, compiler/container pin, sanitizer settings,
120-second per-test timeout, stop-on-failure and required checks are preserved.

Design intent

Keep the per-test hang guard separate from the capacity budget for a growing
suite. The preserved push/PR logs show the same deadline and test boundary,
after both independent compressed-artifact reference checks passed. Successful
partial output remains a failed check; no failure is suppressed or retried
unchanged until it happens to pass.

Phase discipline

This is a CI regression discovered during P2-09, filed separately from its
implementation. #100 is natively blocked by #649. Research semantics and the
scientific protocol are unchanged. Job timing is infrastructure evidence only.

Verification

  • Signed fix source f47ad2925b72e4a5355636e1f6c02301cd7fe8a7 changes exactly the workflow and documentation.
  • Parsed before/after YAML differs only at jobs.sanitizers.timeout-minutes,
    from 15 to 30. All eight local hooks and git diff --check pass.
  • Preserved failure and verification evidence, SHA-256
    d8b505405a3c4f637facc2168a13072c3f2db1577fffd56fa02b9d9dde40e36f. The archive also identifies the complete 91-test local evidence
    from PR #648; no additional simulator rerun is claimed for this config change.
  • All eight checks must pass on this PR's exact head before its three issue
    steps are checked once and it is merged. P2-09 must then pass its own final-head
    CI with this fix integrated before its checklist is updated or it is merged.
# Task Closes #649. ## Summary The expanded 91-test suite passed locally, but both PR #648 sanitizer jobs exhausted the 15-minute job deadline after 80 passing tests. Give cold setup, compilation, the complete suite and cleanup a bounded 30-minute budget. ## Scope Only the sanitizer workflow's overall timeout and its explanatory documentation change. The full unfiltered suite, compiler/container pin, sanitizer settings, 120-second per-test timeout, stop-on-failure and required checks are preserved. ## Design intent Keep the per-test hang guard separate from the capacity budget for a growing suite. The preserved push/PR logs show the same deadline and test boundary, after both independent compressed-artifact reference checks passed. Successful partial output remains a failed check; no failure is suppressed or retried unchanged until it happens to pass. ## Phase discipline This is a CI regression discovered during P2-09, filed separately from its implementation. #100 is natively blocked by #649. Research semantics and the scientific protocol are unchanged. Job timing is infrastructure evidence only. ## Verification - Signed fix source `f47ad2925b72e4a5355636e1f6c02301cd7fe8a7` changes exactly the workflow and documentation. - Parsed before/after YAML differs only at `jobs.sanitizers.timeout-minutes`, from 15 to 30. All eight local hooks and `git diff --check` pass. - [Preserved failure and verification evidence](https://git.erikinkinen.fi/attachments/374ca36f-049d-47cd-bb12-e596186415b9), SHA-256 `d8b505405a3c4f637facc2168a13072c3f2db1577fffd56fa02b9d9dde40e36f`. The archive also identifies the complete 91-test local evidence from PR #648; no additional simulator rerun is claimed for this config change. - All eight checks must pass on this PR's exact head before its three issue steps are checked once and it is merged. P2-09 must then pass its own final-head CI with this fix integrated before its checklist is updated or it is merged.
erikinkinen added this to the Phase 2 milestone 2026-10-21 00:32:35 +02:00
CI: budget cold sanitizer jobs for the complete suite (#649)
Some checks failed
markdownlint / markdown-lint (pull_request) Successful in 18s
clang-format / check-format (pull_request) Successful in 35s
ci / smoke (pull_request) Successful in 9m59s
ci / sanitizers (pull_request) Successful in 13m3s
markdownlint / markdown-lint (push) Successful in 20s
clang-format / check-format (push) Successful in 34s
ci / smoke (push) Successful in 6m40s
ci / sanitizers (push) Has been cancelled
f47ad2925b
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erikinkinen/AES!650
No description provided.