CI: budget complete Phase 2 suites without reducing checks #656
No reviewers
Labels
No labels
bug
cli
core
docs
event
experiment
figure
invariant
metrics
oracle
phase-0
phase-1
phase-2
phase-3
phase-4
phase-5
phase-6
provenance
revocation
tests
workload
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
erikinkinen/AES!656
Loading…
Reference in a new issue
No description provided.
Delete branch "phase2/bug-655-ci-suite-budget"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Task
Closes #655.
Summary
Both sanitizer jobs on #652 passed119–120 of192 tests before the overall
30-minute deadline. Allow90 minutes for both complete sequential CI suites,
including cold builds. Keep the120-second sanitizer per-test limit and all
commands, test selection, assertions, instrumentation and failure settings.
Scope and design intent
Exactly two workflow timeout fields and their documentation change. This bounded
capacity allowance also anticipates the prepared comparable second generator
family; it is not a runtime guarantee or scientific performance measurement.
There is no simulator, analysis, workload or protocol change.
Verification
52b8c4fe72da86dcc9ce87d5daf3e19ac7b83da5; structural YAML comparison proves every otherworkflow field unchanged. All eight hooks and frozen workspace/PDF scope pass.
SHA-256
264d53d00b6138d1844ba6a279a8608cc6c8c87fa32644b72c35d0612c54e967. Both jobs terminate at the overall runner deadline,with no individual test failure or timeout. Unexecuted tests remain unvalidated.
192-test consumer #652 before checking this bug's three steps and merging.
The baseline92-test suite alone is insufficient capacity evidence.
before checking #103 once and merging. Existing source-bound local evidence
remains unchanged; the consumer integration will record exact output hashes.