Phase 2: generate lineage-swap paired intent tapes (#103) #652

Merged
erikinkinen merged 6 commits from phase2/p2-11-a-lineage-swap into main 2026-10-21 04:12:08 +02:00
Owner

Task

Closes #103 (P2-11-A).

Summary

Generate complete sealed lineage-swap tapes with prospective fixed roles,
recorded assignment/rights draws and the identical128-epoch continuation.
Actual executed cuts have matching authority/access and the specified origins.

Scope

Sizes8/32/128, all seven unchanged mechanisms,84 smoke cells and14all/zero-target
boundary cells. Independent Python checks every record and role mapping for
30tapes. A_clone and saved minimum witnesses remain #105; deleted bridges are #104.

Design intent

Generation has only seed and size inputs. Both tapes and roles exist before
execution; logical handles remain distinct from physical IDs. Full execution
checks every actual suffix use, source/event binding, Read-only policy target,
clock and first difference. lineage_basic retains its ancestor-walk semantics.

Phase discipline

Protocol2.2/backlog2.2.1; #100/#101 and the separate CI fix #653 are closed.
Development fixtures establish correctness; production measurement, formal claims
and manuscript conclusions retain their separate gates. Complete csaI includes
the requested Phase5 recovery supplement.

Verification

  • Source a353fbc32ccef7e9355f74f7fb7d596beba3cb4e passed all192 tests in GCC Debug,
    GCC Release and Clang unoptimized Debug ASan/UBSan:98pairs and25,088actual uses
    per build. The independent reference checks10,704records and2,784variates.
  • Both remote sanitizer jobs on eded66b72c7f95fb54e40bd9d9f4df2f2203acbe timed out at120s on four large
    cells. The separate fix #654 passed all eight checks and merged at 862f8a4caf198a931c32cd1f7e03097a9eab7154.
  • Integrated source 42678fc531c634933473fbb55603524d8e2ad390 changes only workflow/docs from the failed head;
    every compiled source and test byte is unchanged. An additional full192-test
    Debug -g -O1 ASan/UBSan run with one worker passed in538.57s on the same
    compiled source tree, with no skips and unchanged reference fingerprints.
  • Original source validation
    and CI integration evidence preserve exact provenance. The latter's
    SHA-256 is 0e969d89e15c00b657585dcd4ee478235fb9330516eeceed94b0785780e680a5. Tracked ci-integration.json records the superseded
    workflow/doc hashes explicitly; original implementation evidence remains intact.
  • All eight local hooks and frozen workspace/PDF scope checks pass. All eight
    remote checks must pass on the final integrated head before the one-step issue
    checklist update and merge. Both CI suites run one worker; sanitizers retain
    assertions, instrumentation and120s per-test limits. The current overall budgets are90min under candidate #656.

Expanded-suite budget regression

The previous integrated head f9b114fa0d5d3d9ce1530d7941af61083bd9c0fb passed119/120tests before both
sanitizer jobs hit their30-minute overall deadline. #655 records this separate
failure. Candidate #656 changes only the two job budgets to90minutes.
Integration source 0c0bcdd1bb99918f75e7276d72efb39a3427157c has exactly the same compiled source/test
tree as the preceding consumer; only workflow/docs differ and match the fix
candidate byte-for-byte. Earlier source and integration records remain intact.
Budget integration evidence has SHA-256 2999e9cec323fda71d31f8884bd6fa28826365c7c122694c585b502a801b34ab.

Both #656 and this192-test consumer must pass all eight exact-head checks before
checking or merging #655/#656. Then this issue's native dependencies must be
closed and its own checks successful before checking #103 once and merging.
Baseline92-test capacity is not substituted for this expanded-suite gate.

# Task Closes #103 (P2-11-A). ## Summary Generate complete sealed lineage-swap tapes with prospective fixed roles, recorded assignment/rights draws and the identical128-epoch continuation. Actual executed cuts have matching authority/access and the specified origins. ## Scope Sizes8/32/128, all seven unchanged mechanisms,84 smoke cells and14all/zero-target boundary cells. Independent Python checks every record and role mapping for 30tapes. A_clone and saved minimum witnesses remain #105; deleted bridges are #104. ## Design intent Generation has only seed and size inputs. Both tapes and roles exist before execution; logical handles remain distinct from physical IDs. Full execution checks every actual suffix use, source/event binding, Read-only policy target, clock and first difference. lineage_basic retains its ancestor-walk semantics. ## Phase discipline Protocol2.2/backlog2.2.1; #100/#101 and the separate CI fix #653 are closed. Development fixtures establish correctness; production measurement, formal claims and manuscript conclusions retain their separate gates. Complete csaI includes the requested Phase5 recovery supplement. ## Verification - Source `a353fbc32ccef7e9355f74f7fb7d596beba3cb4e` passed all192 tests in GCC Debug, GCC Release and Clang unoptimized Debug ASan/UBSan:98pairs and25,088actual uses per build. The independent reference checks10,704records and2,784variates. - Both remote sanitizer jobs on `eded66b72c7f95fb54e40bd9d9f4df2f2203acbe` timed out at120s on four large cells. The separate fix #654 passed all eight checks and merged at `862f8a4caf198a931c32cd1f7e03097a9eab7154`. - Integrated source `42678fc531c634933473fbb55603524d8e2ad390` changes only workflow/docs from the failed head; every compiled source and test byte is unchanged. An additional full192-test Debug `-g -O1` ASan/UBSan run with one worker passed in538.57s on the same compiled source tree, with no skips and unchanged reference fingerprints. - [Original source validation](https://git.erikinkinen.fi/attachments/832704ea-e07f-417f-b9a9-18439dc3771f) and [CI integration evidence](https://git.erikinkinen.fi/attachments/850f9a39-03ba-4681-b31f-56e1fd671dea) preserve exact provenance. The latter's SHA-256 is `0e969d89e15c00b657585dcd4ee478235fb9330516eeceed94b0785780e680a5`. Tracked `ci-integration.json` records the superseded workflow/doc hashes explicitly; original implementation evidence remains intact. - All eight local hooks and frozen workspace/PDF scope checks pass. All eight remote checks must pass on the final integrated head before the one-step issue checklist update and merge. Both CI suites run one worker; sanitizers retain assertions, instrumentation and120s per-test limits. The current overall budgets are90min under candidate #656. ## Expanded-suite budget regression The previous integrated head `f9b114fa0d5d3d9ce1530d7941af61083bd9c0fb` passed119/120tests before both sanitizer jobs hit their30-minute overall deadline. #655 records this separate failure. Candidate #656 changes only the two job budgets to90minutes. Integration source `0c0bcdd1bb99918f75e7276d72efb39a3427157c` has exactly the same compiled source/test tree as the preceding consumer; only workflow/docs differ and match the fix candidate byte-for-byte. Earlier source and integration records remain intact. [Budget integration evidence](https://git.erikinkinen.fi/attachments/8b985c8b-6daa-436d-99b1-d68c168f5865) has SHA-256 `2999e9cec323fda71d31f8884bd6fa28826365c7c122694c585b502a801b34ab`. Both #656 and this192-test consumer must pass all eight exact-head checks before checking or merging #655/#656. Then this issue's native dependencies must be closed and its own checks successful before checking #103 once and merging. Baseline92-test capacity is not substituted for this expanded-suite gate.
erikinkinen added this to the Phase 2 milestone 2026-10-21 01:54:47 +02:00
Phase 2: record lineage-swap validation acceptance (#103)
Some checks failed
markdownlint / markdown-lint (push) Successful in 31s
markdownlint / markdown-lint (pull_request) Successful in 29s
clang-format / check-format (push) Successful in 51s
clang-format / check-format (pull_request) Successful in 50s
ci / sanitizers (pull_request) Failing after 22m1s
ci / sanitizers (push) Failing after 22m7s
ci / smoke (pull_request) Successful in 29m40s
ci / smoke (push) Successful in 29m48s
eded66b72c
Phase 2: record lineage-swap CI integration evidence (#103)
Some checks failed
markdownlint / markdown-lint (push) Successful in 40s
markdownlint / markdown-lint (pull_request) Successful in 40s
clang-format / check-format (pull_request) Successful in 1m23s
clang-format / check-format (push) Successful in 1m27s
ci / sanitizers (push) Failing after 30m3s
ci / sanitizers (pull_request) Failing after 30m3s
ci / smoke (push) Has been cancelled
ci / smoke (pull_request) Has been cancelled
f9b114fa0d
CI: allow bounded completion of full Phase 2 suites (#655)
Some checks failed
markdownlint / markdown-lint (pull_request) Successful in 34s
clang-format / check-format (pull_request) Successful in 1m18s
ci / smoke (pull_request) Successful in 17m20s
ci / sanitizers (pull_request) Successful in 21m34s
markdownlint / markdown-lint (push) Successful in 13s
clang-format / check-format (push) Successful in 26s
ci / sanitizers (push) Has been cancelled
ci / smoke (push) Has been cancelled
52b8c4fe72
Phase 2: retain expanded-suite budget failure and integration evidence (#103)
All checks were successful
clang-format / check-format (pull_request) Successful in 1m25s
markdownlint / markdown-lint (pull_request) Successful in 47s
ci / sanitizers (pull_request) Successful in 37m22s
ci / smoke (pull_request) Successful in 51m5s
markdownlint / markdown-lint (push) Successful in 52s
clang-format / check-format (push) Successful in 1m4s
ci / sanitizers (push) Successful in 23m45s
ci / smoke (push) Successful in 44m7s
aef917b939
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
erikinkinen/AES!652
No description provided.